Substitución de consumo de gasoil por biomasa con nueva caldera - Segovia (AGDCL-3)

Energy

Status: Signed

 

Amount : 60.800€

Yearly interest:  

monthly instalments: 60

Investors: 79


100% 100%

Positive impact generated

This project drastically reduces the heating bill of the company by 25% and will enable reducing CO2 emissions in the atmosphere by about 701 tonnes annually.

Project summary:
Collective financing (crowdlending)  for the replacement of a diesel boiler with a biomass boiler, for a company specialised in the drying of serrano ham from Carbonero el Mayor (Segovia, Spain). This project drastically reduces the heating bill of the company by 25% and will enable reducing CO2 emissions in the atmosphere by about 701 tonnes annually.

 


Project details:
The company AUTÉNTICA GENERACIÓN DISTRIBUIDA DE CASTILLA Y LEÓN, S.L. (AGDCL) has installed a 500 kW industrial biomass boiler, model LASIAN “Biocompact 500 frontal” for a large ham drying business situated in Carbonero el Mayor (Segovia, Spain), replacing the previous diesel boiler which will be maintained in place for maintenance or in case of breakdown of the new boiler. The boiler is installed in an outdoor thermal container, with cyclone to prevent the emission of particles, automatic ash collection, electronic control systems and hoppers, and is accompanied by a 46 m3 warehouse ready to store 30 tons of pellets. The installation is completed with valves, pumps, a hydraulic expansion vessel, hydraulic installation and electrical installation.

The company in which the biomass boiler is installed needs a constant heating system to dry about 600.000 hams per year and has appointed AGDCL to provide and guarantee this service. The boiler will consume an estimated 575 tons of pellets per year.

The total cost of the new installation is €121.176 (+ VAT). The crowdlending campaign is set to finance 50% of the installation. 

The installation will produce 25% saving on the cost of heating for the company.

The CO2 emissions of the ham drying company will be reduced by approximately 701 tons per year, thanks to the quasi full elimination of its oil consumption

The ham drying company has signed a 6 years contract with AGDCL for the provision of pellets, at constant price and quality. Furthermore, AGDCL will handle all preventive and corrective maintenance of the installations, with a 24 X 7 emergency service all year long.   

Antiga caldera de gasoil

The old diesel boiler


Guaranties of the collective loan:
The loan has a personal guarantee from AUTÉNTICA GENERACIÓN DISTRIBUIDA DE CASTILLA Y LEÓN, S.L as well as 50% of the financed installations and the 50% of the economic rights of the pellet supply contract.

 


 

Description of the technology:
Industrial 500KW biomass boiler LASIAN model BIOCOMPACT 500 FRONTAL.

 


 




Ecrowd does not charge any commission on your investments or received interest.
The received interest will be subject to the applicable withholding tax.

Ecrowd is a regulated crowdlending operator (Plataforma de Financiación Participativa) with a licence from the Spanish Financial Authority (CNMV).

Ecrowd is not an investment services company or credit institution and does not participate in any investment guarantee fund or deposit guarantee fund. The investment projects presented on this platform are not subject to authorization or prior supervision by the CNMV or the Bank of Spain, and the information provided by the developers has not been reviewed by these institutions. All funds are deposited on the electronic payments platform LemonWay payment, which is registered with Bank of Spain. The performance of your portfolio depends on the success of each individual project. There is a risk of total or partial loss of the invested capital, not obtaining the expected financial return and limited liquidity. Carefully read the detailed project information before commiting to any investment. By investing in this project, you expressly state you have received, read and accepted the general conditions of Ecrowd Diversification is the optimal strategy for managing your investment portfolio.

More information: how to invest with Ecrowd




This project is 100% financed and the project details and updates are only accesible to investors that have invested in this project.
Please log in to ask new questions. If you don't have an account, please register here.

Investors

Nicolas

2.800€

Carlos

2.500€

Agustín

2.500€

Macarena

2.500€

Sergio

2.000€

José Maria

2.000€

Andrés

2.000€

Josep

2.000€

Jose Ramon

2.000€

Kristophe

2.000€

Mahewa

2.000€

Jordi

2.000€

Roberto

1.750€

María Isabel

1.500€

Laurent

1.500€

-

1.500€

Esther

1.300€

Detlef

1.200€

Andres

1.000€

Jordi

1.000€

Eduardo

1.000€

Félix

1.000€

Alejandro

1.000€

Dani

1.000€

David

1.000€

Pere

1.000€

Marina

1.000€

Emöke

1.000€

Luis Fernando

1.000€

Miguel Ángel

975€

Jordi

850€

Jesús

750€

Jordi

750€

Pedro

600€

-

550€

Javier

500€

M. Carmen

500€

Jose Ignacio

500€

Urs

500€

Angel

500€

Jaime

500€

Alejandro

500€

Andrés

500€

Francisco

500€

Jaime

400€

Raül

400€

Enric

400€

Alvaro

350€

Luis Alberto

300€

Jesús Manuel

300€

Maria Antonia

300€

Jaime F.

300€

Manuel

250€

Guillermo

250€

Miguel

200€

Sabine

200€

Sergi

200€

Marc

200€

Elena

150€

Alfonso

150€

Mario

150€

Gerard

125€

Antonio José

100€

Míriam

100€

Jesus

100€

Manuel

100€

Adrian

100€

Noelia

75€

Jennifer

75€

Matthieu

50€

Armand J.

50€

Jean-Baptiste

50€

Antonio

50€

Javier

50€

Ferran

50€

David

50€

Joaquin

50€

Enrique

50€

Alberto

50€

Would you like to be like them?

This project is 100% financed and the project details and updates are only accesible to investors that have invested in this project.
This project is 100% financed and the project details and updates are only accesible to investors that have invested in this project.
This project is 100% financed and the project details and updates are only accesible to investors that have invested in this project.
This project is 100% financed and the project details and updates are only accesible to investors that have invested in this project.

There are no updates yet